I've been on the road most of my career, I am willing to go were ever the work is.
OBJECTIVE
To secure a position as a Superintendent or as a Safety Repesentative, in the construction field and or office, that will utilize my education and special abilities to promote the growth and the development of a progressive organization.
WORK HISTORY
Aug. 2007- Oct. 2008 Project Superintendent, Hayward Baker, Roselle, IL
ïµ Responsible for ordering materials, working up schedules, budgets, hiring
personnel and setting up equipment for jobs & seeing jobs from start to finish.
• Conversing issues with Engineers and helping to resolve and offer solutions.
Accomplishments Helped in the development and implemented the installation of a number of precast retaining walls along the Missouri River for the Reading Railroad to stabilize the tracks from sliding into the river. I’ve worked in the development of other projects with the installation of Mini Piles, Compaction Piles, Sink Hole Stabilization and help with productivity and safe working environment.
June 2006- Aug. 2007 Project Manager, Atlas / Mix On Site, Lincolnshire, IL.
ïµ Responsible for ordering materials, working up schedules, budgets, hiring
personnel and setting up equipment for jobs & seeing jobs from start to finish.
• Conversing issues with Engineers and helping to resolve and offer solutions, also working with the development of design and build as needed to expedite the completion of ongoing projects.
• Working as a Field Safety Representative to ensure that ATLAS & MIX ON SITE is in compliance with OSHA and many of the other safety agencies to best of my ability.
Accomplishments Developed an elaborate drill for drilling with helical ties on the water for a bridge project. I’ve worked in the development of other projects to with the installation of Mini Piles and help with productivity and safe working environment. Have also worked with void filling and Cellular Concrete. For the convenience of the field and office, redevelopment of grout logs, drill logs, Utility forms, accident forms & reformatted to be used in Spanish and English.
June 1999- June 2006 Superintendent, Berkel & Company, Pasadena, Md.
ïµ Responsible for ordering materials, working up schedules, budgets, hiring personnel and setting up equipment for jobs & seeing jobs from start to finish.
• Conversing issues with Engineers and helping to resolve and offer solutions.
• Working as a Field Safety Representative to ensure that Berkel & Company is in compliance with OSHA, MOSHA and many of the other safety agencies to best of my ability.
Accomplishments Designed a shut off switch on the drill on tooliers side for emergency shut off. An elaborate casing rack for storing, shipping & for working with on the job. Have also worked in the development of precast facing to solder piles so as to not infringe on other Patients. I’ve worked in the development other projects to help with productivity and safe working environment. For the field and office redeveloped grout logs drill logs, Miss Utility forms & reformatted tieback test sheets to be used on PC’s.
Feb 1990 - May 1999 Superintendent, TerraTech Inc., Leesburg, Va.
ïµ Responsible for drawing up budgets, organizing man power, equipment and materials.
ïµ Converse issues and offer solutions with Engineers. Draw up project details on the job.
Accomplishments Developed and had patented for TerraTech, an elaborate precast connection to solder piles and soil nailing. Developed bracket attachments for prestressing old existing tieback anchors for bars and strands.
Apr.1986- Feb.1990 Foreman / Superintendent, Earth Support Systems, Sterling, Va.
• Accountable for creating a budget, organizing man power, equipment and materials. Oversaw all permanent tieback walls with precast facing.
Accomplishments helped with the further development and progress of precast and its installation and connections.
June1984-Apr.1986 Proprietor, J & J Mobile Welding, Grapevine, TX.
Subcontract to Contractors
• Contract to precast i.e. consulting, welding, erecting, overseeing and bidding.
Accomplishments Finished Phase II of Beaver Run, Brechenridge, Colo., Twin Towers of Dallas, TX., The Goldberg GYM Building of Littleton, Colo., and numerous other precast structures.
EDUCATION
1999 5 Month Course with ABC Contractors / Project Manager Academy
1997 1 Year AST Civil Engineering, International Correspondence Schools
March 1993 General Drafting, International Correspondence School
May 1991 Surveying and Mapping, International Correspondence Schools
January 1981 Carpenters Apprenticeship Program, Carpenters Millcabinet & Interior Systems Statewide JATC
PROFESSIONAL TRAINING
• AWS certified in all positions 1â€, light gauge and mig
 Certified in CPR & 1st. AED Trainer
 OSHA Trainer / Instructor Course, UWV
 Rigging Trainer
 HAZWOPER Trainer / Instructor Course, UM
 Confined Space / Forklift Trainer
 Jones Hazardous Waste Training
REPRESENTATIVE PROJECTS SUPERVISED
• Permanent Anchor Walls with Precast Facing for D.O.T. in Virginia, Pennsylvania, North Carolina, Tennessee and The Corps of Engineers. Permanent Anchor Walls with Precast Piles and Precast Facing for the Railroad. Have worked permanent Soil Nailing walls with precast, stone facing and pored in place face in Pennsylvania, Virginia and Maryland for the D.O.T. and the Federal Highway Administration.
Numerous Precast Projects in Texas and Colorado
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.